The printing company H.R.G. spol. s.r.o. has built a photovoltaic power plant on the roofs of the production plant to reduce the cost of energy consumption.
Location: Střední Čechy, Czech Republic (Česká Republika)
Project: RESINDUSTRY
Replacement of 3 old boilers for one new automatic boiler with an output of 300 kW. The wood residues from production are burned in the boiler.
Location: Jihozápad, Czech Republic (Česká Republika)
Project: RESINDUSTRY
Usage of the hybrid photovoltaic system with accumulation in batteries to support the energy consumption of the warehouse.
Location: Střední Čechy, Czech Republic (Česká Republika)
Project: RESINDUSTRY
Installation of a sustainable energetic management system and a self-consumption, photovoltaic plant.
Location: Extremadura, Spain (España)
Project: RESINDUSTRY
The company has taken two actions, firstly they have carried out an energy audit to assess their weaknesses and secondly they have decided to install RES.
Location: Extremadura, Spain (España)
Project: RESINDUSTRY
A Self-consumption installation of photovoltaic panels situated at the roof of the main plant, of an olive company based in the table olives production.
Location: Extremadura, Spain (España)
Project: RESINDUSTRY
MPB not only to produce biogas with the organic wastes of the area but also to generate an additional biogas station for vehicles.
Location: Extremadura, Spain (España)
Project: RESINDUSTRY
Rooftop photovoltaic plant in ALUMASA, made in 2 phases, first 1.37 MWp and second 1.6 MWp.
Location: Extremadura, Spain (España)
Project: RESINDUSTRY
The winery López Morenas installed in 2015 a 1500 kW biomass boiler to produce thermal energy.
Location: Extremadura, Spain (España)
Project: RESINDUSTRY
Replacement of conventional boilers to biomass boilers.
Location: Extremadura, Spain (España)
Project: RESINDUSTRY