During the last decade, a demand for increased comfort and high temperatures in summer have led to a strong development of air conditioning in tertiary buildin
As part of its environmental concerns, particularly in terms of energy savings and the use of renewable energies, the company SCI Rose des Sables wishes to create a solar air conditioning installation as part of the equipment of the pharmaceutical warehouse. from Aurar to Mont Roquefeuil. The COTEL INGENIERIE design office carried out a feasibility study for the installation that is the subject of this grant request.
The objectives assigned to this project are:
- energy savings for the entity: 54% reduction in electricity consumption costs
- a positive impact on the environment: annual volume of 24.2 tonnes of CO2 avoided by the recourse
renewable energies (solar energy)
- Descriptive technique:
Following COTEL's recommendations, the beneficiary considers a solution with the supply of a system
compact solar handset SPS1 - 40 available with air conditioning.
The air conditioning group includes:
- the adsorption machine
- additional or emergency cold production thanks to a compressor integrated into the machine
- the condenser
- the different circulation pumps:
• solar collectors circulation pump
• pump between the hot water buffer tank and the adsorption machine
• cooling circuit pump (condenser)
• micro-trickle pump from the adiabatic cooler
• circulation pump from the chilled water circuit to the terminal units;
Within the framework of this project, the financial partners are: the Region, FEDER, the company (the SCI Rose des Sables Company), and the main be

Resources needed

Financing plan for selected expenses:

EU - FEDER € 23,100
CPN - Region € 9,900
Client € 22,000
TOTAL € 55,000

Evidence of success

This practice is considered to be effective, because it allows companies to save energy, thus reducing the costs of their energy consumption by half.
also a virtuous approach and a positive impact on the environment

Difficulties encountered

The difficulties encountered within the framework of this project are mainly related to the administrative order for the assembly of the file

Potential for learning or transfer

This project has real learning potential in the field of energy management for industrial and tertiary companies, which is a sector that consumes more energy.
Project
Main institution
Conseil Régional de la Réunion
Location
La Réunion, France
Start Date
March 2018
End Date
December 2018