It is a national project funded by the Regional Operational Program 2014-2020
According to the Technical Expertise Report, no consolidation / repair works are required to condition the works.
increase energy efficiency. By applying the package of maximum measures within the Energy Audit Report, they aimed to decrease the primary energy consumption by approximately 47.01%, as well as to decrease the thermal energy consumption by approximately 72.70%. Thus, the values recorded for the specific annual consumption of primary energy and the specific annual level of equivalent CO2 emissions will be, following the intervention, below the values imposed by the guide for the reference year 2018. After implementing the measures proposed in the Maximum Package, produced from renewable sources reached a level of 20.86% of the total primary energy consumption of the rehabilitated building. By increasing the energy performance of the public building, in the short and medium term, the local public authority is relieved of the expenses with conventional fuel used, the expenses with the maintenance of the building are reduced, the support of economic agents in the construction field is ensured and new jobs are created. of the intervention. Partial energy production with the help of the biomass plant will reduce CO2 emissions.

Resources needed

The total value of the project is 226,438,005 euros, of which the non-reimbursable financial assistance is 190,541,726 euros.

Evidence of success

1 Energy efficient building by carrying out intervention works aimed at thermal rehabilitation works of the tire
- Thermal insulation of the facade - opaque part, with expanded polystyrene of 10 cm;
- Insulation of the bridge with extruded polystyrene 10 cm thick;
- Extruded polystyrene with a thickness of 2.0 cm will be used for washers and plinths, for thermal insulation.
Thermal rehabilitation works of the heating system / of the hot water supply system

Difficulties encountered

The beneficiaries did not encounter any difficulties.

Potential for learning or transfer

Given that this project is aimed at saving resources and implementing environmentally friendly solutions, the aim was to reduce annual primary energy consumption by about 47.01%, energy consumption for space heating decreased by about 72.7%, and gas emissions with a greenhouse effect of 13.87 t CO2 / year. ). The implementation of the project was successful, and can be an example of good practice for other authorities.
Project
Main institution
Regional Development Agency South West
Location
Sud-Vest Oltenia, Romania (România)
Start Date
July 2017
End Date
December 2018